Project Description

FRANKLIN COUNTY K-12

Project Location:  

East Point, Florida

Construction Completed: 

2010

Project Elements: 

George & Associates aided the owner in the site selection process by providing preliminary site evaluation with respect to wetlands, soils, location, utilities, earthwork and roadway improvements. Over the course of the project, G&A aided in the coordination between the Army Corp of Engineers, Florida Wildlife Conservation Commission, Florida Department of Environmental Protection and the general contractor in the placement of the dredged and trucked in material for the purpose of elevating the site to a suitable finished grade. We were also responsible for preparing Final Construction Documents for this project which included grading design, hydraulic conveyance design, utility support systems (Water and Sewer), stormwater management design, roadway design, and design improvements and site master planning. In addition to the above, all permitting issues pertaining to the listed design tasks were accomplished. This would include site plan approval from Franklin County, stormwater permitting from FDEP, water, and sewer permits from FDEP, roadway improvement permits from FDOT and transmission line relocation permits from Progress Energy Florida.