Town of Greenville Septic Tank Abatement

Project Location:  

Madison County, Fl

Construction Completed: 

2009

Project Elements: 

George and Associates, Consulting Engineers, Inc. performed design, permitting and construction inspection services for the Town of Greenville septic tank abatement project. G&A was instrumental in developing the project scope to obtain funding through the Community Development Block Grant Program. The project included construction of approximately 3,260 LF of new 8-inch & 12-inch gravity sewer and two new lift stations. The project connected 27 existing residential households and abandoned 27 septic tank systems. Additionally, the project provided 41 future sanitary sewer connections to contribute to septic tank abatement. Detailed tasks included utility relocations, removal and replacement of existing roadways, drainage improvements, and on-site project inspection services. The project was completed on schedule and within budget.