CENTURYLINK STORMWATER STUDY & IMPROVEMENTS

Project Location:  

Tallahassee, Florida

Construction Completed: 

2003

Project Elements: 

CenturyLink commissioned George & Associates to analyze site conditions at its Apalachee Parkway facility in Tallahassee, Florida, and to design improvements, to assist in the elimination of on-going flooding. G&A engineers prepared Engineering Reports focused on delineation of drainage basins, on-site meetings with adjacent property owners, and results of hydraulic/hydrologic modeling used to determine flooding stages associated with periodic storm events common to the Tallahassee area. Our services included preparation of construction documents and assistance with local environmental permitting.