Project Description

ST. ANDREWS STATE PARK

Project Location:  

Panama City Beach, Florida

Construction Completed: 

2011

Project Elements: 

Muncipal Sewer Phase 3

George and Associates Consulting Engineers, Inc. contracted with the Florida Department of Environmental Protection to design and permit as well as assist in the bidding of the sewer collection/transmission system for the Phase III Municipal Sewer Connection within St. Andrew’s State Park. Our scope of service included the direction of abandonment of the existing On-Site Treatment and Disposal Systems (OSTDS), the layout and design of the proposed collection/transmission sewer system, permitting through all agencies having jurisdictional authority, coordination of consultants (electrical and geotechnical) and preparing and aiding in the bidding of the Construction Documents. Included within the design phase, our office generated hydraulic models in conjunction with the Panama City Beach Utilities Department to ensure any and all system constraints were identified and met. In doing so, we worked closely with the municipal utility departments as well as the park officials in determining existing and potential loads generated from primarily the park bathrooms and bathhouses.